The bathroom lights have arrived and are now in situ. This week radiator was put back in place and over the weekend we've painted the door (Rolling Fog Mid to go with the walls - Rolling Fog Pale). The towel holder is also up.
Still to do: painting the bath exterior and getting it back into the bathroom from the cave. Plus regrouting the floor tiles - firstly removing the previous grouting, which will be a really fun job to do ...
We've also started on the entrance hallway doors (five doors in total). When Jane's mum stayed in September she did a sterling job in taping round the small windows, making painting a lot easier. At this stage we are just doing the hallway side of the doors, the other sides are for rainy days over winter.
Meanwhile, Shadow and Wellington found watching us work quite exhausting:
No comments:
Post a Comment