30 March 2012

High wire

At last the electric wire drapped across the front of the house, and originally linked into the dependence (now the gite), has been removed. After 3 months of waiting, the job took all of five minutes to do. It was also the first time we've seen 'proper' safety equipment being worn.

No comments:

Post a Comment