The old kitchen room now has a new floor in what will be the ensuite bathroom. We have been able to use left-over tiles from the gite renovation. Original old tiles have also been put in the main part of the bedroom, over a large hole in the floor. This was where the original cooking range was plus a shute going from the grenier through the kitchen down to the manger in the cave. Hay was sent via this to feed the animals below. 
The cardboard walkway to the work site:
The hallway work site. Still some way to go ...